2
results found in
2 ms
Page 1
of 1
Ministry of Education realized corrective measures incorrectly
The audited bodies were Ministry of Education (ME), Ministry of Informatics (MI), Institute for Educational Information, regional authorities of Liberec and PlzeĆ, and 42 chosen primary, secondary ... , and high schools, as well as some other educational facilities. (See the complete list of chosen schools enclosed to the audit report.). ... ... Educational project managed ineffectively ... Several problems - from documentation to ineffectiveness - in designing and financing were found by the Czech SAI in a government program: the Funding Conception for Communication Services at Schools.
Full description
The audited bodies were Ministry of Education (ME), Ministry of Informatics (MI), Institute for Educational Information, regional authorities of Liberec and PlzeĆ, and 42 chosen primary, secondary ... , and high schools, as well as some other educational facilities. (See the complete list of chosen schools enclosed to the audit report.). ... ... Educational project managed ineffectively ... Several problems - from documentation to ineffectiveness - in designing and financing were found by the Czech SAI in a government program: the Funding Conception for Communication Services at Schools.
Full description
Supreme Audit Office
, issued in 2007
Risk cases: 2
The management of the State Property and Funds while Information Systems Building for the Ministry of Defence
The aim of the audit was to examine management during process of extension and modernization of the current information systems and at building of new information systems for the needs ... of the Ministry of Defence or the Army of the Czech Republic. Operating of information systems is inseparably linked with the communication infrastructure, thus the technological shift to ICT was reviewed also ... in this connection. The stationary ICT systems are determined to support management of the Ministry of Defence in period of peace. They are also supposed as a tool of crisis management. The auditing operation covered ... ... Information systems not balanced with infrastructure ... Both organizational changes and inflexibility produce unbalanced plans which cause deiscrepancies between IS and infrastructure.
Full description
The aim of the audit was to examine management during process of extension and modernization of the current information systems and at building of new information systems for the needs ... of the Ministry of Defence or the Army of the Czech Republic. Operating of information systems is inseparably linked with the communication infrastructure, thus the technological shift to ICT was reviewed also ... in this connection. The stationary ICT systems are determined to support management of the Ministry of Defence in period of peace. They are also supposed as a tool of crisis management. The auditing operation covered ... ... Information systems not balanced with infrastructure ... Both organizational changes and inflexibility produce unbalanced plans which cause deiscrepancies between IS and infrastructure.
Full description
Supreme Audit Office
, issued in 2005
Risk cases: 2
2
results found.
Page 1
of 1