80
results found in
10 ms
Page 1
of 8
Federal Institute for Risk Assessment purchased unnecessary software
Risk of poor requirements management The Germamn SAI audited the Federal Institute for Risk Assessment that introduce a new software. Time of implementation was nearly three times as long as originally scheduled. The costs also nearly trebled. Moreover, the Institute purchased unnecessary licences for expanding the software
Full description
Risk of poor requirements management The Germamn SAI audited the Federal Institute for Risk Assessment that introduce a new software. Time of implementation was nearly three times as long as originally scheduled. The costs also nearly trebled. Moreover, the Institute purchased unnecessary licences for expanding the software
Full description
Bundesrechnungshof
, issued in 2017
Risk cases: 2
Software management assessment in local governments and local government educational institutions
Objective of the audit was to verify compliance of software recording and management with regulatory enactments, as well as to assess the effectiveness of software management in local governments ... and local government educational institutions. ... ... Software management assessment in local governments and local government educational institutions ... Manage your software! Local governments and local government education institution neglect basic safety procedures, use outdated or illegal kinds of software, use two and more different software ... for the same function.
Full description
Objective of the audit was to verify compliance of software recording and management with regulatory enactments, as well as to assess the effectiveness of software management in local governments ... and local government educational institutions. ... ... Software management assessment in local governments and local government educational institutions ... Manage your software! Local governments and local government education institution neglect basic safety procedures, use outdated or illegal kinds of software, use two and more different software ... for the same function.
Full description
State Audit Office of the Republic of Latvia
, issued in 2013
Risk cases: 4
Material–technical supply of the State Police
. The audit included inspections performed at the State Police, the Ministry of the Interior and the Information Centre and focused on: the Biometric data processing system and the Criminal Procedure ... information system. ... The main aim of the audit was to obtain assurance about whether the State budget funds allocated for material–technical supply of functions of the State Police were legitimate and efficient ... ... Essential role of pre-project evaluation ... SAI of Latvia reveals chain of events that lead to unsuccessful implemenation of two important IS of the State police. What started with an absence of the strategy ended up with budget, time ... overruns and an IS not ready for effiecient use.
Full description
. The audit included inspections performed at the State Police, the Ministry of the Interior and the Information Centre and focused on: the Biometric data processing system and the Criminal Procedure ... information system. ... The main aim of the audit was to obtain assurance about whether the State budget funds allocated for material–technical supply of functions of the State Police were legitimate and efficient ... ... Essential role of pre-project evaluation ... SAI of Latvia reveals chain of events that lead to unsuccessful implemenation of two important IS of the State police. What started with an absence of the strategy ended up with budget, time ... overruns and an IS not ready for effiecient use.
Full description
State Audit Office of the Republic of Latvia
, issued in 2013
Risk cases: 6
The Board of Audit and Inspection (BAI) conducted an audit on the information systems in the area of service delivery to improve the system’s efficiency and convenience.
for citizens in the welfare and employment sectors by utilizing the renewed information infrastructure.<br/> However, the information system of some government ministries proved to have overlapping functions ... and there was a noticeable lack of connectivity between them. Errors and omitted data by the administrators were discovered as well, leading to the citizens losing faith in the system. ... Korea was recognized as an Information Technology (IT) powerhouse by the international community of the UN in 2010. Such an achievement is attributable to the significant investments that the Korean ... Enormous IT investments require tremendous coordination ... Korean government is investing 1 trillion won in e-government projectsevery year. Thus, the country has earned a reputation for the IT powerhouse. Apart from undeniable advantages, the huge scale ... and the speed, the information technologies are implemented with, cause some problems to be tackled. The SAI Korea turns special atention to two of them: overlapping functionalities and interconnectivity issues.
Full description
for citizens in the welfare and employment sectors by utilizing the renewed information infrastructure.<br/> However, the information system of some government ministries proved to have overlapping functions ... and there was a noticeable lack of connectivity between them. Errors and omitted data by the administrators were discovered as well, leading to the citizens losing faith in the system. ... Korea was recognized as an Information Technology (IT) powerhouse by the international community of the UN in 2010. Such an achievement is attributable to the significant investments that the Korean ... Enormous IT investments require tremendous coordination ... Korean government is investing 1 trillion won in e-government projectsevery year. Thus, the country has earned a reputation for the IT powerhouse. Apart from undeniable advantages, the huge scale ... and the speed, the information technologies are implemented with, cause some problems to be tackled. The SAI Korea turns special atention to two of them: overlapping functionalities and interconnectivity issues.
Full description
Board of Audit and Inspection of Korea
, issued in 2011
Risk cases: 3
Auditing the National Rationing System
to the rules and regulations in order to make an assessment of soundness of the Ration system and its related operations. ... The audit was to investigate the data quality, validity and reliability of two sub-systems (Ration Card and Ration Distribution) of a National Rationing System (Ration System) with the comparison ... Unreliable databases trigger all kinds of possible problems ... Ministry responsible for functioning of the National Rationing System developed to automate and optimize the delivery of essential subsidized commodities to eligible beneficiaries and providing state ... with reliable information fails its job.
Full description
to the rules and regulations in order to make an assessment of soundness of the Ration system and its related operations. ... The audit was to investigate the data quality, validity and reliability of two sub-systems (Ration Card and Ration Distribution) of a National Rationing System (Ration System) with the comparison ... Unreliable databases trigger all kinds of possible problems ... Ministry responsible for functioning of the National Rationing System developed to automate and optimize the delivery of essential subsidized commodities to eligible beneficiaries and providing state ... with reliable information fails its job.
Full description
State Audit Bureau of Kuwait
, issued in 2014
Risk cases: 4
Municipalities’ internal control system – Audit of the establishment and operation of the internal control system of municipalities – on the audit of Rudabánya
Incomplete internal control The SAI Hungary published the compliance audit of the establishment and operation of the internal control system, as well as certain investment decisions, their implementation and accounting at the Local Government of Rudabánya. Apart from positive findings, some accounting irregularities and insufficient controls established to ensure organisational integrity were pointed out.
Full description
Incomplete internal control The SAI Hungary published the compliance audit of the establishment and operation of the internal control system, as well as certain investment decisions, their implementation and accounting at the Local Government of Rudabánya. Apart from positive findings, some accounting irregularities and insufficient controls established to ensure organisational integrity were pointed out.
Full description
State Audit Office of Hungary
, issued in 2018
Risk cases: 2
Building and Implementing the Phoenix Pay System
Expensive IT project became a failure Phoenix project (development of states pay system) was an incomprehensible failure of project management and oversight. Phoenix executives prioritized certain aspects, such as schedule and budget, over other critical ones, such as functionality and security. Phoenix executives did not understand the importance of warnings that the Miramichi Pay Centre, departments and agencies, and the new system were not ready. They did not provide complete and accurate information to deputy ministers and associate deputy ministers of departments and agencies, including the Deputy Minister of Public Services and Procurement, when briefing them on Phoenix readiness for implementation.
Full description
Expensive IT project became a failure Phoenix project (development of states pay system) was an incomprehensible failure of project management and oversight. Phoenix executives prioritized certain aspects, such as schedule and budget, over other critical ones, such as functionality and security. Phoenix executives did not understand the importance of warnings that the Miramichi Pay Centre, departments and agencies, and the new system were not ready. They did not provide complete and accurate information to deputy ministers and associate deputy ministers of departments and agencies, including the Deputy Minister of Public Services and Procurement, when briefing them on Phoenix readiness for implementation.
Full description
Office of theAuditor Generalof Canada
, issued in 2018
Risk cases: 3
FEMA Needs to Address Management Weaknesses to Improve Its Systems
Controls in emergency management GAO audited the agency of the Department of Homeland Security, responsible for federal efforts to mitigate, respond to, and recover from disasters. American auditors recommend that the agency fully define its investment board’s roles and responsibilities and procedures for selecting and overseeing investments, update its strategic plan and complete plans for IT modernization, and establish time frames for completing workforce planning efforts. The agency should also establish policies and guidance for implementing key IT management controls.
Full description
Controls in emergency management GAO audited the agency of the Department of Homeland Security, responsible for federal efforts to mitigate, respond to, and recover from disasters. American auditors recommend that the agency fully define its investment board’s roles and responsibilities and procedures for selecting and overseeing investments, update its strategic plan and complete plans for IT modernization, and establish time frames for completing workforce planning efforts. The agency should also establish policies and guidance for implementing key IT management controls.
Full description
General Accountability Office
, issued in 2016
Risk cases: 4
Federal Agencies Need to Address Aging Legacy Systems
Be aware of legacy IT risks The US government spends about 75 percent of the total amount budgeted for information technology on operations and maintenance. GAO reviewed Office of Management and Budget and 26 agencies, covering years 2010 through 2017 and recommends to develop a goal for spending measure and finalize guidance to identify and prioritize legacy IT needing to be modernized or replaced.
Full description
Be aware of legacy IT risks The US government spends about 75 percent of the total amount budgeted for information technology on operations and maintenance. GAO reviewed Office of Management and Budget and 26 agencies, covering years 2010 through 2017 and recommends to develop a goal for spending measure and finalize guidance to identify and prioritize legacy IT needing to be modernized or replaced.
Full description
General Accountability Office
, issued in 2016
Risk cases: 3
Parallel Audit on Biometric Passports - Overall Results (anonymised)
A biometric passport (or ePassport) contains biometric information which serves to authenticate the identity of travellers. Biometric passport management is the process of establishing ... and implementing the regulation on standards for security features and biometrics in passports and travel documents issued by the member states. The aim is to develop and maintain efficient and secure biometric ... passport production procedures (see page 5). ... EUROSAI ITWG: Parallel Audit on Biometric Passports ... process is generally under control while a couple of high-risk findings were identified in the non-process-specific assessments. In the non-process-specific assessments, most of the countries found ... deficiencies and weaknesses related to the IS/IT system and the IT management. Medium risks have been identified in the area of laws and regulations, cost-benefit realisation and transparency, as well ... Swiss SAI summed up results of audits concluded in seven countries (Belgium, Latvia, Lithuania, Norway, Portugal, Switzerland). The evaluation of the reported results showed that the overall passport
Full description
A biometric passport (or ePassport) contains biometric information which serves to authenticate the identity of travellers. Biometric passport management is the process of establishing ... and implementing the regulation on standards for security features and biometrics in passports and travel documents issued by the member states. The aim is to develop and maintain efficient and secure biometric ... passport production procedures (see page 5). ... EUROSAI ITWG: Parallel Audit on Biometric Passports ... process is generally under control while a couple of high-risk findings were identified in the non-process-specific assessments. In the non-process-specific assessments, most of the countries found ... deficiencies and weaknesses related to the IS/IT system and the IT management. Medium risks have been identified in the area of laws and regulations, cost-benefit realisation and transparency, as well ... Swiss SAI summed up results of audits concluded in seven countries (Belgium, Latvia, Lithuania, Norway, Portugal, Switzerland). The evaluation of the reported results showed that the overall passport
Full description
Swiss Federal Audit Office
, issued in 2015
Risk cases: 4