29
results found in
8 ms
Page 1
of 3
Parallel Audit on Biometric Passports - Overall Results (anonymised)
A biometric passport (or ePassport) contains biometric information which serves to authenticate the identity of travellers. Biometric passport management is the process of establishing ... and implementing the regulation on standards for security features and biometrics in passports and travel documents issued by the member states. The aim is to develop and maintain efficient and secure biometric ... passport production procedures (see page 5). ... EUROSAI ITWG: Parallel Audit on Biometric Passports ... Swiss SAI summed up results of audits concluded in seven countries (Belgium, Latvia, Lithuania, Norway, Portugal, Switzerland). The evaluation of the reported results showed that the overall passport ... as in security regulations relating to internal and external personnel. ... process is generally under control while a couple of high-risk findings were identified in the non-process-specific assessments. In the non-process-specific assessments, most of the countries found
Full description
A biometric passport (or ePassport) contains biometric information which serves to authenticate the identity of travellers. Biometric passport management is the process of establishing ... and implementing the regulation on standards for security features and biometrics in passports and travel documents issued by the member states. The aim is to develop and maintain efficient and secure biometric ... passport production procedures (see page 5). ... EUROSAI ITWG: Parallel Audit on Biometric Passports ... Swiss SAI summed up results of audits concluded in seven countries (Belgium, Latvia, Lithuania, Norway, Portugal, Switzerland). The evaluation of the reported results showed that the overall passport ... as in security regulations relating to internal and external personnel. ... process is generally under control while a couple of high-risk findings were identified in the non-process-specific assessments. In the non-process-specific assessments, most of the countries found
Full description
Swiss Federal Audit Office
, issued in 2015
Risk cases: 4
Audit on the operation of the “Ministry of Finance” Central Budget Chapter
The audit was carried out on the "Ministry of Finance" central budget chapter and covered the period of 2003-2008. One of the audited activities of the Ministry were the IT systems ... and their development and the role of the Hungarian State Treasury within the IT framework of public finances. ... ... Simple receipt: calculate costs, standardize data, divide duties... ... Hungarian Audit Office analyzed in detail fundamentals of proper IT investment taking into account problems of Budget Management System.
Full description
The audit was carried out on the "Ministry of Finance" central budget chapter and covered the period of 2003-2008. One of the audited activities of the Ministry were the IT systems ... and their development and the role of the Hungarian State Treasury within the IT framework of public finances. ... ... Simple receipt: calculate costs, standardize data, divide duties... ... Hungarian Audit Office analyzed in detail fundamentals of proper IT investment taking into account problems of Budget Management System.
Full description
State Audit Office of Hungary
, issued in 2008
Risk cases: 3
Performance Audit of the Georgian Government electronic Procurement system
of interest for the State Audit Office. Considering the fact that since 2010 major part of public procurements is being conducted electronically and there is no alternative tool, uninterrupted provision ... of existing data through effective procurement policies and procedures. <br /> Having considered aforementioned factors, SAO conducted performance audit of the Georgian electronic Government Procurement system ... . The audit was aimed to identify system’s shortcomings and issue recommendations to eliminate them. To accomplish audit objectives, the auditors assessed the performance of Ge-GP system’s management ... ... Electronic procurement system - how effective are management and control mechanisms? ... SAI Georgia analyzed the electronic Government Procurement system. In their report they focus on compliance and security problems, which may harm the business goals and overall mission of the system.
Full description
of interest for the State Audit Office. Considering the fact that since 2010 major part of public procurements is being conducted electronically and there is no alternative tool, uninterrupted provision ... of existing data through effective procurement policies and procedures. <br /> Having considered aforementioned factors, SAO conducted performance audit of the Georgian electronic Government Procurement system ... . The audit was aimed to identify system’s shortcomings and issue recommendations to eliminate them. To accomplish audit objectives, the auditors assessed the performance of Ge-GP system’s management ... ... Electronic procurement system - how effective are management and control mechanisms? ... SAI Georgia analyzed the electronic Government Procurement system. In their report they focus on compliance and security problems, which may harm the business goals and overall mission of the system.
Full description
State Audit Office Of Georgia
, issued in 2016
Risk cases: 5
Performance Audit of Public Debt Management Information Systems
of information systems in the public debt management process and having considered legal requirements to information security, State Audit Office of Georgia conducted Performance Audit of Public Debt Management ... of Georgia. <br/> In the framework of the forehead mentioned audit, SAOG decided to initiate an IT audit of the MOF information systems used in Public Debt Management. The Audit was focused on Public Debt ... and External Financing Department – Ministry’s organizational unit responsible for public debt management. Audit team evaluated the activities of the IT service provider - LEPL Financial-Analytical Service ... ... More effective IT governance needed ... Importance of effective performance of public debt management e-systems may be explained by the world’s increased dependence on such systems. In parallel with the performance audit of debt management ... information systems of the Ministry Of Finance of Georgia, Supreme Audit Institutions of 11 countries also studied this topic, both in terms of systems’ performance and their practical application by local ... financial institutions. Audit conducted by the State Audit Office of Georgia has revealed security and governance shortcomings related to management and usage of these systems.
Full description
of information systems in the public debt management process and having considered legal requirements to information security, State Audit Office of Georgia conducted Performance Audit of Public Debt Management ... of Georgia. <br/> In the framework of the forehead mentioned audit, SAOG decided to initiate an IT audit of the MOF information systems used in Public Debt Management. The Audit was focused on Public Debt ... and External Financing Department – Ministry’s organizational unit responsible for public debt management. Audit team evaluated the activities of the IT service provider - LEPL Financial-Analytical Service ... ... More effective IT governance needed ... Importance of effective performance of public debt management e-systems may be explained by the world’s increased dependence on such systems. In parallel with the performance audit of debt management ... information systems of the Ministry Of Finance of Georgia, Supreme Audit Institutions of 11 countries also studied this topic, both in terms of systems’ performance and their practical application by local ... financial institutions. Audit conducted by the State Audit Office of Georgia has revealed security and governance shortcomings related to management and usage of these systems.
Full description
State Audit Office Of Georgia
, issued in 2014
Risk cases: 5
Audit on the broadband internet infrastructure access
Poland has been granted over PLN 4 billion from the European Regional Development Fund to build the broadband internet access infrastructure. As part of three operational programmes 90 percent ... of assumed financing was contracted, namely PLN 3.9 billion. By the end of 2015, Poland should complete the investment and account for the expenses. According to NIK there is a risk that the infrastructure ... construction will not be completed by the deadline and the EU funds may not be used to the full. ... ... Simpler regulations and better supervision needed ... Polish SAI audited a project, which aim had been to develop broadband internet network across the country. They revealed that legal obstacles, idleness and lack of supervision were the main causes ... of delays. Some of the projects are in danger of not being completed on time and some of the EU funds may not be fully used.
Full description
Poland has been granted over PLN 4 billion from the European Regional Development Fund to build the broadband internet access infrastructure. As part of three operational programmes 90 percent ... of assumed financing was contracted, namely PLN 3.9 billion. By the end of 2015, Poland should complete the investment and account for the expenses. According to NIK there is a risk that the infrastructure ... construction will not be completed by the deadline and the EU funds may not be used to the full. ... ... Simpler regulations and better supervision needed ... Polish SAI audited a project, which aim had been to develop broadband internet network across the country. They revealed that legal obstacles, idleness and lack of supervision were the main causes ... of delays. Some of the projects are in danger of not being completed on time and some of the EU funds may not be fully used.
Full description
Supreme Audit Office of Poland
, issued in 2015
Risk cases: 2
Audit of the Government, Government-guaranteed and Municipal Debt Management Information Systems in the Ministry of Finance of the Republic of Bulgaria
The main audit question studied during the audit was: Are the government, government-guaranteed (SDMS) and municipal debt management information systems (CMDR) at the Ministry of Finance effective ... ? The audit covered the period from 01.01.2013 to 31.12.2013 and investigated four major areas: IT system strategy and general management; IT security and controls against disasters; Operational controls ... and Documentation; Application Controls. ... ... Even effective and modern IT systems require improvements and updates to ensure their security and accountability ... the established system is effective and provides updated, complete and correct information. Nevertheless the audit report points out areas of security, application controls as well as documentation as the subjects ... For the management of the government, government-guaranteed and municipal debt the Ministry of Finance has established an advanced integrated information infrastructure. According to Bulgarian SAI ... that need further improvement and optimization.
Full description
The main audit question studied during the audit was: Are the government, government-guaranteed (SDMS) and municipal debt management information systems (CMDR) at the Ministry of Finance effective ... ? The audit covered the period from 01.01.2013 to 31.12.2013 and investigated four major areas: IT system strategy and general management; IT security and controls against disasters; Operational controls ... and Documentation; Application Controls. ... ... Even effective and modern IT systems require improvements and updates to ensure their security and accountability ... the established system is effective and provides updated, complete and correct information. Nevertheless the audit report points out areas of security, application controls as well as documentation as the subjects ... For the management of the government, government-guaranteed and municipal debt the Ministry of Finance has established an advanced integrated information infrastructure. According to Bulgarian SAI ... that need further improvement and optimization.
Full description
Bulgarian National Audit Office
, issued in 2014
Risk cases: 3
Preparations and realization of the State A-levels
The aim of the audit was to scrutinise the utilisation of the state budget and EU budget funds that had been spent on preparing and implementing the State A-levels examinations. The auditing ... operation was performed from May to November 2011. The audited period extended from January 1, 2005, to June 30, 2011; where relevant, the data from the previous period and the period until the end ... of the auditing operation were also scrutinized. Among the audited bodies were the Ministry of Education, the Education Result Survey Centre, and the National Institute for Further Education. The auditing operation ... ... Begin with good strategy ... Analyzing problems of state examinations system, Czech Republic SAI found that commonplace strategy effected in shortsighted planning, poor procurement and disadvantageous contracting.
Full description
The aim of the audit was to scrutinise the utilisation of the state budget and EU budget funds that had been spent on preparing and implementing the State A-levels examinations. The auditing ... operation was performed from May to November 2011. The audited period extended from January 1, 2005, to June 30, 2011; where relevant, the data from the previous period and the period until the end ... of the auditing operation were also scrutinized. Among the audited bodies were the Ministry of Education, the Education Result Survey Centre, and the National Institute for Further Education. The auditing operation ... ... Begin with good strategy ... Analyzing problems of state examinations system, Czech Republic SAI found that commonplace strategy effected in shortsighted planning, poor procurement and disadvantageous contracting.
Full description
Supreme Audit Office of Czech Republic
, issued in 2011
Risk cases: 4
Report on the government’s processing of confidential data on persons and companies
Rigsrevisionen has examined how eight government institutions process confidential data on persons and companies in 11 selected IT systems. The report is based on IT audits carried out in connection ... with the annual audit in the spring 2014. The purpose of the audit was to assess whether confidential data on persons and companies are adequately protected by the government institutions. ... ... Inadequate protection of confidential data ... If a government institution does not protect confidential data to the extent necessary, the risk that third parties get unauthorized access to the data is very high. In opinion of the Danish SAI ... , inadequate protection of confidential data may also erode the citizens’ and companies’ confidence in government data security. That may eventually become a barrier for the continued efforts to implement ... e-government and make government administration more efficient.
Full description
Rigsrevisionen has examined how eight government institutions process confidential data on persons and companies in 11 selected IT systems. The report is based on IT audits carried out in connection ... with the annual audit in the spring 2014. The purpose of the audit was to assess whether confidential data on persons and companies are adequately protected by the government institutions. ... ... Inadequate protection of confidential data ... If a government institution does not protect confidential data to the extent necessary, the risk that third parties get unauthorized access to the data is very high. In opinion of the Danish SAI ... , inadequate protection of confidential data may also erode the citizens’ and companies’ confidence in government data security. That may eventually become a barrier for the continued efforts to implement ... e-government and make government administration more efficient.
Full description
National Audit Office of Denmark
, issued in 2014
Risk cases: 2
IT Police Systems
Implementation by the Polish Police of two IT projects (E-police station and Command Support System - CSS) was audited. Both systems were to relieve the Police officers and increase the quality ... and effectiveness of their work. Audit explained the reason of failure in the case of E-police station project and success in the case of CSS. Although some irregularities occurred in both cases, careful planning ... and organization of the project turned out to make the difference. Accordance with the public procurement law was not part of the audit as a separate investigation in that matter was carried by respective Polish ... ... A textbook example of how not to implement the IT projects ... Polish NIK compared the implementation of two flagship IT projects of the Police HQ: successful 'Command Support System' and problematic 'E-police station'. List of interesting problems appeared...
Full description
Implementation by the Polish Police of two IT projects (E-police station and Command Support System - CSS) was audited. Both systems were to relieve the Police officers and increase the quality ... and effectiveness of their work. Audit explained the reason of failure in the case of E-police station project and success in the case of CSS. Although some irregularities occurred in both cases, careful planning ... and organization of the project turned out to make the difference. Accordance with the public procurement law was not part of the audit as a separate investigation in that matter was carried by respective Polish ... ... A textbook example of how not to implement the IT projects ... Polish NIK compared the implementation of two flagship IT projects of the Police HQ: successful 'Command Support System' and problematic 'E-police station'. List of interesting problems appeared...
Full description
Supreme Audit Office of Poland
, issued in 2013
Risk cases: 5
Results of the development of the state’s information systems
The National Audit Office has repeatedly audited the management and development of the state’s information technology (IT) area in the last ten years. The last audit was performed in 2005. After that ... , several measures have been implemented in the state to organise the development better and to guarantee that the systems are compatible. This audit gives an opinion of the results of development project ... management and the state’s coordination mechanism in this process. ... ... Success and failure depend on preparation ... Conclusions of performance IT audit based on a sample of government projects: business portal, land register, e-police, fire safety monitoring system, childcare information system and the document ... management system of the Defence Forces. Key problems and discussion with auditees are presented.
Full description
The National Audit Office has repeatedly audited the management and development of the state’s information technology (IT) area in the last ten years. The last audit was performed in 2005. After that ... , several measures have been implemented in the state to organise the development better and to guarantee that the systems are compatible. This audit gives an opinion of the results of development project ... management and the state’s coordination mechanism in this process. ... ... Success and failure depend on preparation ... Conclusions of performance IT audit based on a sample of government projects: business portal, land register, e-police, fire safety monitoring system, childcare information system and the document ... management system of the Defence Forces. Key problems and discussion with auditees are presented.
Full description
National Audit Office of Estonia
, issued in 2010
Risk cases: 3