163
results found in
11 ms
Page 7
of 17
Performance Audit of the Management of ICT in the Criminal Justice Sector
The Norwegian OAG has assesed how the Ministry of Justice and Public Security has discharged its responsibility for effiecient case processing through developing and applying Information ... and Communications Technology (ICT) in the criminal justice sector ... ... Unclear signals from a Ministry weaken development of ICT in the justice chain ... Points by SAI Norway: development of an overall rolling action plan based on the current ICT (Information and Communication Technology) strategy for the justice sector, performance-oriented ... reporting from the subordinate agencies, ensuring that the new ICT Police System takes into account other sub-sectors need for electronic interaction.
Full description
The Norwegian OAG has assesed how the Ministry of Justice and Public Security has discharged its responsibility for effiecient case processing through developing and applying Information ... and Communications Technology (ICT) in the criminal justice sector ... ... Unclear signals from a Ministry weaken development of ICT in the justice chain ... Points by SAI Norway: development of an overall rolling action plan based on the current ICT (Information and Communication Technology) strategy for the justice sector, performance-oriented ... reporting from the subordinate agencies, ensuring that the new ICT Police System takes into account other sub-sectors need for electronic interaction.
Full description
Office of the Auditor General of Norway
, issued in 2012
Risk cases: 2
Coordination of Infrastructure Works by Metropolitan Municipalities
Rapid population growth at metropoles as well as dense and planless structuring, especially in İstanbul and Ankara, have lead to an increase in demand for utilities services and consequently ... in coordination of infrastructure services at MMs and preventing resource waste. ... , in the resources used for the construction and maintenance of utilities. Moreover, in cities with dense population, damages to roads and sidewalks during the construction and maintenance of utilities cause problems ... ... ... Start geographic information system with cooperation rules and digital maps ... Organization of geographic and infrastructure information systems is an especially difficult task when bacause vast and intense coordination is necessary. The Turkisch Court of Accounts lists ... problems that reduce use and rise costs of this fundamental task.
Full description
Rapid population growth at metropoles as well as dense and planless structuring, especially in İstanbul and Ankara, have lead to an increase in demand for utilities services and consequently ... in coordination of infrastructure services at MMs and preventing resource waste. ... , in the resources used for the construction and maintenance of utilities. Moreover, in cities with dense population, damages to roads and sidewalks during the construction and maintenance of utilities cause problems ... ... ... Start geographic information system with cooperation rules and digital maps ... Organization of geographic and infrastructure information systems is an especially difficult task when bacause vast and intense coordination is necessary. The Turkisch Court of Accounts lists ... problems that reduce use and rise costs of this fundamental task.
Full description
Turkish Court of Accounts
, issued in 2008
Risk cases: 2
The Annual Municipal Accounts as a basis for comparing municipalities - are the cost indicator reliable?
Municipal accounting: more standardized or more controlled Municipalities report among others, their costs, which cannot be directly attributed to any specific activity, product, or service. Standardized taxonomies exist, but they are not applied uniformly. Swedish NAO traces ramifications: lower ability to compare municipalities' data and need of more central level control.
Full description
Municipal accounting: more standardized or more controlled Municipalities report among others, their costs, which cannot be directly attributed to any specific activity, product, or service. Standardized taxonomies exist, but they are not applied uniformly. Swedish NAO traces ramifications: lower ability to compare municipalities' data and need of more central level control.
Full description
Swedish National Audit Office
, issued in 2018
Risk cases: 3
Submission of data to national databases in municipalities, towns and cities
The National Audit Office analysed the activities of the database managers following a ruling made by the Supreme Court in 2010, which stated that the public functions assigned to local authorities ... must be clearly financed from the state budget. It was also assessed whether the measures taken by database managers have been sufficient to guarantee that local authorities submit all required data ... and that these data are correct. ... ... Funds as basic factor of data processing ... The NAO of Estonia audited the activities of state agencies in the management of the database selected for the audit, to which local authorities are obliged to submit data. It was found that in most ... cases the state does not compensate the costs of data submission for local governments.
Full description
The National Audit Office analysed the activities of the database managers following a ruling made by the Supreme Court in 2010, which stated that the public functions assigned to local authorities ... must be clearly financed from the state budget. It was also assessed whether the measures taken by database managers have been sufficient to guarantee that local authorities submit all required data ... and that these data are correct. ... ... Funds as basic factor of data processing ... The NAO of Estonia audited the activities of state agencies in the management of the database selected for the audit, to which local authorities are obliged to submit data. It was found that in most ... cases the state does not compensate the costs of data submission for local governments.
Full description
National Audit Office of Estonia
, issued in 2013
Risk cases: 1
Conflicts of interest
First, recognise the conflicts of interest are a real risk the British NAO gathered a significant amount of intelligence on conflicts, particularly in the health and education sectors. These are areas of government where services are increasingly commissioned and delivered by parties at arm’s-length to departments. Conflicts of interest can occur naturally as a product of the way a system is designed and most often arise from operational situations.
Full description
First, recognise the conflicts of interest are a real risk the British NAO gathered a significant amount of intelligence on conflicts, particularly in the health and education sectors. These are areas of government where services are increasingly commissioned and delivered by parties at arm’s-length to departments. Conflicts of interest can occur naturally as a product of the way a system is designed and most often arise from operational situations.
Full description
National Audit Office
, issued in 2015
Risk cases: 8
Steps Needed to Identify Acquisition Training Needs for Non-Acquisition Personnel
Non-Acquisition staff can be crucial for acquisition Despite from hundreds of billions of dollars spent annually to acquire products and services, the US Department of Defense does not full information about staff to be trained. The information is needed about the non-acquisition staff, who can play crucial role in particular acquisitions. As GAO underlines, their identification is necessary to fully understand the training needs and... budget.
Full description
Non-Acquisition staff can be crucial for acquisition Despite from hundreds of billions of dollars spent annually to acquire products and services, the US Department of Defense does not full information about staff to be trained. The information is needed about the non-acquisition staff, who can play crucial role in particular acquisitions. As GAO underlines, their identification is necessary to fully understand the training needs and... budget.
Full description
US Government Accountability Office
, issued in 2019
Risk cases: 4
Electronic Health Records - VA Needs to Identify and Report Existing System Costs
Difficulties after 30 years of decentralized development The US Department of Veterans Affairs provides health care services to approximately 9 million veterans and their families. However, the IT system they use is more than 30 years old, is costly to maintain, and does not fully support exchanging health data. The US GAO, analyzed the system's modenization plans and found serious problems with definition and cost estimation.
Full description
Difficulties after 30 years of decentralized development The US Department of Veterans Affairs provides health care services to approximately 9 million veterans and their families. However, the IT system they use is more than 30 years old, is costly to maintain, and does not fully support exchanging health data. The US GAO, analyzed the system's modenization plans and found serious problems with definition and cost estimation.
Full description
US Government Accountability Office
, issued in 2019
Risk cases: 3
State aid for IT projects in social and health care
information system services (KanTa project) or the National Project for Social Services IT (Tikesos project). Financing has been provided by the Ministry of Social Affairs and H ealth, the Finnish Funding ... In 2000-2009 about 180 million euros in national and European Union funds went to finance information technology projects in social and health care, not including the costs of developing national ... Agency for Technology and Innovation (Tekes), regional councils (previously state provincial offices), and indirectly by the Slot Machine Association under the direction of the Ministry of Social Affairs ... Difficult coordination of IT projects ... Finish Audit Office analyzed results of poor cooperation between authorities on national and local level in social and health care projects: difficult integration of information systems and poor ... coordination of the financing information technology projects, including double financing.
Full description
information system services (KanTa project) or the National Project for Social Services IT (Tikesos project). Financing has been provided by the Ministry of Social Affairs and H ealth, the Finnish Funding ... In 2000-2009 about 180 million euros in national and European Union funds went to finance information technology projects in social and health care, not including the costs of developing national ... Agency for Technology and Innovation (Tekes), regional councils (previously state provincial offices), and indirectly by the Slot Machine Association under the direction of the Ministry of Social Affairs ... Difficult coordination of IT projects ... Finish Audit Office analyzed results of poor cooperation between authorities on national and local level in social and health care projects: difficult integration of information systems and poor ... coordination of the financing information technology projects, including double financing.
Full description
National Audit Office of Finland
, issued in 2011
Risk cases: 3
Central government staff costs
Results of staff reductions The British NAO found that departments had significantly reduced numbers of their civil servants and of course salary costs at the same time. But they reduced staff numbers mainly by minimising recruitment, and the age profile of the civil service has changed. NAO pays a lot attention to what effect this has had on the future pipeline of talent and skills. It reminds also that the departments need long-term operating models to work efficiently with the staff reduced.
Full description
Results of staff reductions The British NAO found that departments had significantly reduced numbers of their civil servants and of course salary costs at the same time. But they reduced staff numbers mainly by minimising recruitment, and the age profile of the civil service has changed. NAO pays a lot attention to what effect this has had on the future pipeline of talent and skills. It reminds also that the departments need long-term operating models to work efficiently with the staff reduced.
Full description
National Audit Office
, issued in 2015
Risk cases: 5
Ministry of Education realized corrective measures incorrectly
The audited bodies were Ministry of Education (ME), Ministry of Informatics (MI), Institute for Educational Information, regional authorities of Liberec and Plzeň, and 42 chosen primary, secondary ... , and high schools, as well as some other educational facilities. (See the complete list of chosen schools enclosed to the audit report.). ... ... Educational project managed ineffectively ... Several problems - from documentation to ineffectiveness - in designing and financing were found by the Czech SAI in a government program: the Funding Conception for Communication Services at Schools.
Full description
The audited bodies were Ministry of Education (ME), Ministry of Informatics (MI), Institute for Educational Information, regional authorities of Liberec and Plzeň, and 42 chosen primary, secondary ... , and high schools, as well as some other educational facilities. (See the complete list of chosen schools enclosed to the audit report.). ... ... Educational project managed ineffectively ... Several problems - from documentation to ineffectiveness - in designing and financing were found by the Czech SAI in a government program: the Funding Conception for Communication Services at Schools.
Full description
Supreme Audit Office
, issued in 2007
Risk cases: 2