3
results found in
6 ms
Page 1
of 1
Ministry of Education realized corrective measures incorrectly
The audited bodies were Ministry of Education (ME), Ministry of Informatics (MI), Institute for Educational Information, regional authorities of Liberec and Plzeň, and 42 chosen primary, secondary ... , and high schools, as well as some other educational facilities. (See the complete list of chosen schools enclosed to the audit report.). ... ... Educational project managed ineffectively ... Several problems - from documentation to ineffectiveness - in designing and financing were found by the Czech SAI in a government program: the Funding Conception for Communication Services at Schools.
Full description
The audited bodies were Ministry of Education (ME), Ministry of Informatics (MI), Institute for Educational Information, regional authorities of Liberec and Plzeň, and 42 chosen primary, secondary ... , and high schools, as well as some other educational facilities. (See the complete list of chosen schools enclosed to the audit report.). ... ... Educational project managed ineffectively ... Several problems - from documentation to ineffectiveness - in designing and financing were found by the Czech SAI in a government program: the Funding Conception for Communication Services at Schools.
Full description
Supreme Audit Office
, issued in 2007
Risk cases: 2
The management of the State Property and Funds while Information Systems Building for the Ministry of Defence
of the Ministry of Defence or the Army of the Czech Republic. Operating of information systems is inseparably linked with the communication infrastructure, thus the technological shift to ICT was reviewed also ... The aim of the audit was to examine management during process of extension and modernization of the current information systems and at building of new information systems for the needs ... in this connection. The stationary ICT systems are determined to support management of the Ministry of Defence in period of peace. They are also supposed as a tool of crisis management. The auditing operation covered ... ... Information systems not balanced with infrastructure ... Both organizational changes and inflexibility produce unbalanced plans which cause deiscrepancies between IS and infrastructure.
Full description
of the Ministry of Defence or the Army of the Czech Republic. Operating of information systems is inseparably linked with the communication infrastructure, thus the technological shift to ICT was reviewed also ... The aim of the audit was to examine management during process of extension and modernization of the current information systems and at building of new information systems for the needs ... in this connection. The stationary ICT systems are determined to support management of the Ministry of Defence in period of peace. They are also supposed as a tool of crisis management. The auditing operation covered ... ... Information systems not balanced with infrastructure ... Both organizational changes and inflexibility produce unbalanced plans which cause deiscrepancies between IS and infrastructure.
Full description
Supreme Audit Office
, issued in 2005
Risk cases: 2
State funds spent on development, operation and using of data centres services
The aim of the audit was to scrutinise the management of funds spent on building and operating the national data centre (hereinafter “STC1 data centre”), including the expenditure of selected ... organisational units of the state on buying hosting, server-housing and other related services. The audited period was between 2010 and 2014; where relevant, the preceding period was also scrutinised. Audited ... entities: Ministry of the Interior (“MoI”); Ministry of Finance (“MoF”); STÁTNÍ TISKÁRNA CENIN, state firm (state banknote printing firm, hereinafter “STC” or “the state firm”). The audit was conducted ... ... Risks steming from uncoordinated strategy ... SAI of Czech Republic analysed consequences of failures in strategic IT management at the state level. Lack of coordination and implementation rules reduced practical role of the ministry whose task ... was to guard high quality standards for all crucial IT systems in the state administration. Next consecquences were (among others) risk of uneconomical results of large IT investment and risk of inefficient ... supply of services, as well as opposite results of workforce reduction.
Full description
The aim of the audit was to scrutinise the management of funds spent on building and operating the national data centre (hereinafter “STC1 data centre”), including the expenditure of selected ... organisational units of the state on buying hosting, server-housing and other related services. The audited period was between 2010 and 2014; where relevant, the preceding period was also scrutinised. Audited ... entities: Ministry of the Interior (“MoI”); Ministry of Finance (“MoF”); STÁTNÍ TISKÁRNA CENIN, state firm (state banknote printing firm, hereinafter “STC” or “the state firm”). The audit was conducted ... ... Risks steming from uncoordinated strategy ... SAI of Czech Republic analysed consequences of failures in strategic IT management at the state level. Lack of coordination and implementation rules reduced practical role of the ministry whose task ... was to guard high quality standards for all crucial IT systems in the state administration. Next consecquences were (among others) risk of uneconomical results of large IT investment and risk of inefficient ... supply of services, as well as opposite results of workforce reduction.
Full description
Supreme Audit Office of Czech Republic
, issued in 2015
Risk cases: 7
3
results found.
Page 1
of 1